Prefab Home

FOB Price: Get Latest Price
Model:YD-V4
Certification:GMC,BV,GSG,UN supplier,ISO9001:2000
Minimum Order:4
Brief Description:Quick install, easy to study, save 100% labor cost compare to former housing,suit for family houses, cottages, villa resorts

Wallis Liang

  • Product Details

Basic Specification

roof panel50mm/75mm/100mm
wall panel50mm/75mm/100mm
TypePrefab House
Panel MaterialMetal

Detail Description

Yaoda House Technology is the manufacturer to United Nation Supplier in china and the china prefabricated house state technical standard drafter. Our company always enhance our application abilities of prefab house and promote the new-green style house with strong technical team including 300 employees and 20 professional designers and engineers with rich experience in our field.
 
Basing on our good management, quality and excellent Service, we applied as a "UN supplier" in 2006; meanwhile we got the ISO 9001qaulity control system in 2005. So we are well-known as the most influence brand enterprise at prefab house section in China.
 
Our products have sold to all over the world, for example, Australia, Sudan, Qatar, Saudi Arabia, etc.  Best-sellers in the world market due to the competitive price, high quality, and best after-sell service and so on! We can supplier you the best service. 
 
 
 Prefab house:
 
1. C section steel structure could be more firmly and reasonable.There are several types of sandwich panel, for example the EPS sandwich panel, PU sandwich panel and rock wool sandwich panel, which has different use.
2. used in building site and can be reused in lots of projects, which is very economical.The prefab house can be used for accommodation, office, control center, canteen and so on.
3. you can choose how many floor you want, such as two floor and three floor! We can design the house as you requirements!
4.The using life is around 10-15 years.Environmental protection and economy.
5.Each worker can assemble 20~30 square meters every day.
6 worker can finish 300sqm prefab house in 2 days.

YAODA FOCTORY
 



We possess 6 workshops such as Sandwichpanel workshop, Steel structure workshop, Raw material workshop and so on
 


 
 
  Sandwichpanel workshop
 
 
  Steel structure workshop
 
 
  Raw material workshop





 

Additional Information

Payment TermsL/C, T/T
Minimum Order4
Lead Time / Delivery Time30 Day(s)
Sample AvailableYES Ask For Sample
Delivery Details30 days after receive 30% deposite
FOB PortGuangzhou
Loading Infoby shipping container
Packing Infostandard packing
Target Market(s)Africa(except Middle East), Central & Southern Asia, Hong Kong/ Macao/ Taiwan, Mainland China, Middle East, Southeast Asia

Send your message to this manufacturer


3000
SearchPost Buying Lead